Finn Way provided general contracting services for the construction of a new 460 m² water treatment plant, which will incorporate an in-ground reservoir and advanced water treatment technology.
The project involved the installation of a new raw water intake system, mechanical and electrical components, and an expanded water distribution network.
Scope of Work
- Construction of a 460 m² facility to house the new water treatment system and support equipment.
- Integration of an in-ground water storage reservoir for treated water containment.
- Installation of a preselected water treatment process, which includes:
- Ozone pre-treatment to improve water quality by removing organic contaminants and pathogens.
- MS Filter slow sand filtration technology for enhanced purification and long-term reliability.
- Structural, architectural, and finishing work to ensure a fully operational and climate-controlled facility.
- Mechanical system installation, including process piping, valves, and pumping systems.
- HVAC system to regulate temperature and ventilation within the facility.
- Electrical and SCADA (Supervisory Control and Data Acquisition) system to enable remote monitoring and automation of plant operations.
- Standby power generator to ensure uninterrupted water treatment operations during power outages.
- Supply and installation of approximately 1,475 metres of 150 mm diameter watermain to extend and improve the water distribution network.
- Coordination and implementation of a bypass system to maintain existing water flows and ensure uninterrupted service during construction.