Finn Way served as the general contractor for the construction of a single-story masonry school building spanning 18,750 square feet.
This meticulously crafted structure features a sloped truss roof system, resting on a poured concrete foundation and grade beam system. The entire building boasts reinforced masonry block wall construction and incorporates a ground-loop heating system powered by a geothermal drilled well/heat pump system.
The exterior facade showcases high sloped roofs adorned with shingles, masonry stone, and stucco finishes. Notably, the contract encompassed the demolition of the existing school located merely 30 feet in front of the new building. This vacated space was transformed into a drop-off and parking lot, seamlessly integrating with the new construction.
Key highlights of the building include a spacious gymnasium, a unique learning circle space characterized by curved walls and pronounced roof overhangs, and a shielded main entrance designed to withstand the unpredictable northern weather conditions. A distinctive feature of this project is the construction of an independent fire storage reservoir shed, enhancing water pressure for the life safety system throughout the building.
This project, chosen to showcase Finn Way’s prowess in constructing new buildings in regional areas, underscores the company’s success in school projects. This achievement is grounded in Finn Way’s extensive construction experience in Thunder Bay and the Northwestern region, robust relationships with qualified subcontractors, effective scheduling and communication practices, adaptability to changes, and a profound respect for all project stakeholders.
Through meticulous project scheduling, collaborative weekly planning with subcontractors, and transparent communication with all parties involved, Finn Way completed the project within the stipulated tender timeframe and under budget. The Owner experienced uninterrupted, safe operation and access to the facility. Finn Way facilitated the Owner’s occupancy during the final stages of construction, allowing for the storage of furnishings and equipment, as well as the installation of user equipment after achieving Substantial Performance.