Finn Way provided general contracting services for the construction of a new 460 m² water treatment plant, which will incorporate an in-ground reservoir and advanced water treatment technology.

The project involved the installation of a new raw water intake system, mechanical and electrical components, and an expanded water distribution network.

Scope of Work

  • Construction of a 460 m² facility to house the new water treatment system and support equipment.
  • Integration of an in-ground water storage reservoir for treated water containment.
  • Installation of a preselected water treatment process, which includes:
    • Ozone pre-treatment to improve water quality by removing organic contaminants and pathogens.
    • MS Filter slow sand filtration technology for enhanced purification and long-term reliability.
  • Structural, architectural, and finishing work to ensure a fully operational and climate-controlled facility.
  • Mechanical system installation, including process piping, valves, and pumping systems.
  • HVAC system to regulate temperature and ventilation within the facility.
  • Electrical and SCADA (Supervisory Control and Data Acquisition) system to enable remote monitoring and automation of plant operations.
  • Standby power generator to ensure uninterrupted water treatment operations during power outages.
  • Supply and installation of approximately 1,475 metres of 150 mm diameter watermain to extend and improve the water distribution network.
  • Coordination and implementation of a bypass system to maintain existing water flows and ensure uninterrupted service during construction.