Finn Way General Contractor, in collaboration with Bird Construction, undertook the role of general contractor for the design-build construction of a new rapid deployment facility located at the Thunder Bay Correctional Facility site.

This innovative project was characterized by its hybrid construction approach, combining modular and traditional building techniques to deliver a highly efficient and functional facility.

The project featured the off-site fabrication of modular cell structures, a strategy that significantly reduced on-site construction time while maintaining high-quality control. Concurrently, the on-site work focused on constructing the primary facility, including the administration building, common areas, and all foundational elements. These foundations were equipped with pre-installed services such as plumbing, electrical, and HVAC connections to ensure a seamless integration with the incoming modular components.

Upon the arrival of the modular cell units in Thunder Bay, they were carefully offloaded, transported, and craned into their precise positions atop the prepared foundations. This complex process required meticulous coordination and expertise to ensure the accurate alignment and secure placement of each module. Once positioned, the intricate connections between the modular units and the on-site infrastructure were finalized, seamlessly tying the components into a fully functional facility.

This collaborative design-build approach not only expedited the construction schedule but also provided a cost-effective solution without compromising the quality or functionality of the product. Finn Way’s extensive experience in modular integration and Bird Construction’s design expertise ensured the facility met all operational requirements, progressing on schedule and exceeding expectations.